Tender Results
Click on the individual names of the projects to view the tender results.

Closing Date Project Title
9-Nov-18 Term Contract for the Comprehensive Maintenance of Recyclable Waste Collection System for the period 1 Mar 2019 to 31 Mar 2020
31-Oct-18 Construction of 12 banner structures, provision of 20 double-tier bicycle racks and upgrading of existing lift lobby and walkway floor at Blk 673 Woodlands Dr 71 in Sembawang GRC
31-Oct-18 Installation and Replacement of Illuminated Block Signs , Block Directional Signs and RC Notice boards in Lifts in Sembawang GRC
23-Oct-18 Replacement of Lampposts and Underground Cables for Sembawang and Woodlands Divisions
23-Oct-18 Replacement of Lampposts and Underground Cables for Admiralty, Canberra and Gambas Divisions
02-Oct-18 Electrical Rewiring to Block 803, 805, 807 to 810, 816, 818, 820, 821, 830, 832, 834, 835, 847 to 850 Woodlands Street 81/ 82/ 83
24-Sep-18 Electrical Load Upgrading (ELU) to 14 Blocks 817, 819, 824, 825, 828, 829, 831, 833, 837, 838, 840, 842, 843 and 845, with Electrical Substation Modification at Blk 823A, 824A, 835 and 846A Woodlands Street 81/ 82/ 83
14-Sep-18 Upgrading Works to Vista Park near Blks 581 to 585 and Blk 574B Woodlands Drive 16
17-Aug-18 Replacement of Refuse Handling Plant to 67 blocks at Blk 330-333, 337, 338, 416, 418-420, 470-481 Sembawang Close/ Drive / Canberra Road, Blks 537- 54, 549- 557, 665-673 681A-681D, 682A-682D, 683A-683D , 684A-684D Woodlands Drive 16/ Drive 44/ Drive 53/ Drive 62/ Drive 71/ Drive 73/ Ring Road
17-Aug-18 Replacement of Water Pumpsets to 37 Blocks at Blk 822, 823, 826. 827, 836, 839, 841, 844, 846. 851, 856-882 Woodlands Street 81/ Street 82/ Street 83/ Ave 4/ Ave 9 and Replacement of Booster Pumpsets to 49 Blocks at Blk 445, 453-457 Yishun Ave 11/ Street 41, Blk 570C, 572B, 606, 607, 610, 611, 616, 617, 630, 631, 644, 645, 650, 651, 654,656- 664, 777-779. 786B-F, 787B-E, 791-795, 797,798 Woodlands Ave 1/ Ave 4/ Drive 60/ Drive 72/ Crescent/ Ring Road
29-Jun-18 Repairs and Redecoration Works to 29 Blocks at Block 508A-C, 509A-B, 510A-B Wellington Circle, Blk 570A-C, 571A-C, 572A-B Woodlands Ave 1, Blk 714- 727 Woodlands Ave 6/ Circle/ Drive 70 in Admiralty and Sembawang Divisions
22-Jun-18 Engagement of WSH Consultant to Carry out Assessment and Make Recommendation for the Installation of the Safety Provisions at Rooftops of Existing HDB Buildings
22-Jun-18 Pre-Qualification for Sembawang Town Council's Panel of Architect Consultants from 1 January 2019 to 31 December 2021 (with an Option to Extend for Another Year)
22-Jun-18 Term Contract for the Design, Printing and Delivery of Newsletters for the Period of 1 January 2019 to 31 December 2020
18-Jun-18 Repairs and Redecoration Works to 34 Blocks at Blk 601 to 605 Woodlands Drive 42, Blk 701 to 707 Woodlands Drive 40, Blk 708 to 713 Woodlands Drive 70, Blk 728 to 743 Woodlands Circle in Woodlands Division.
01-Jun-18 Uprading Works near Blk 303, 307, 309, 312, 313, 316, 317 and Playground near Blk 308 Canberra Road/ Sembawang Drive/ Sembawang Vista in Gambas Division.
18-May-18 Replacement and Comprehensive Maintenance of 80 Passenger Lifts for Sembawang Town Council
11-Apr-18 Construction/ Upgrading of 17 Children Playground, 11 Fitness Corners and 1 Integrated Playground for Sembawang Town Council
2-Mar-18 Replacement/ Upgrading/ Installation of Illuminated Block Signs, RC Notice Boards in Sembawang GRC
29-Dec-17 Term Contract for Social Media Services for Kampung Sembawang Facebook page for the period of 1 March 2018 to 28 February 2019
01-Dec-17 Demolition of Metal Cantilevered Features at Block 624B, 625A and 625B Woodlands Drive 52 in Admiralty Division
17-Nov-17 Term Contract for Grasscutting, Horticulture & Aboriculture Maintenance Works for the period 1 April 2018 to 31 March 2021
17-Nov-17 Term Contract for Comprehensive Maintenance and Servicing of Alert Alarm System (AAS) for the period 1 April 2018 to 31 March 2021
17-Nov-17 Term Contract for Maintenance and Servicing of Electrically & Manually Operated Roller Shutter Doors at Bin Compounds & and Centralised Refused Chutes for the period 1 April 2018 to 31 March 2020
23-Jun-17 Term Contract for Servicing & Maintenance of Fitness Corners from 1 Oct 2017 to 30 Sept 2020
07-Apr-17 Tender for Inspection and Testing of Lighting Columns at Various Locations for 14 Town Councils
31-Mar-17 Replacement & Comprehensive Maintenance of 12 existing lifts under Selective Lift Replacement Programme (SLRP)
24-Mar-17 Construction / Upgrading Of 9 Covered Linkways, 3 BFA Ramps, 6 Drop-Off Points And 2 Linkways With Awning In Sembawang GRC (Contract Period - 10 Months)
10-Mar-17 Upgrading Of 2 Basketball Courts, 4 Game Courts, Upgrading Of 1 Community Garden And Construction Of 3 Community Gardens, Provision Of 12 Banner Structures, Provision Of Double-Tier Bicycle Racks And Construction Of Staircase, Ramp And Footpath In Sembawang GRC
10-Mar-17 Installation / Replacement Of Illuminated Block Signs / Block Directional Signs, Notice Boards And Provision Of RC Notice Boards Inside Lifts In Sembawang GRC
10-Mar-17 Upgrading of 14 Playgrounds (AR 530, GWS, 684B), (CB 336, 357, 417, 474, 478), (GB 353A/354B, 423/425), (SB 776), (WL 737, 608/609, 677), 6 Elderly Fitness Corners (AR 687A, GWS), (GB 423/425), (SB 504A/506A, 588C, 510A), 2 Fitness Corners (AR 687), (GB 423/425) and 1 Integrated Family Playground (CB 424) in Sembawang GRC
23-Dec-16 Upgrading of Jeletung Harbour Park near Blk 486 to 493 Admiralty Link
2-Dec-16 Construction of Linkway at Blk 401 and 404A (MSCP) Admiralty Link
25-Nov-16 Term Contract for the Repairs & Replacement of Emergency Battery Operated Power Supply (EBOPs) Units in Lifts for the period of 1 April 2017 to 31 March 2020
25-Nov-16 Term Contract for the Inspection and Testing of Electrical Installation for the purpose of Licensing of Electrical Installation for the period of 1 April 2017 to 31 March 2020
25-Nov-16 Term Contract for the Maintenance of Coin Operated Water Dispensers (COWD) for the period of 1 April 2017 to 31 March 2020
25-Nov-16 Term Contract for Mosquito Control for the period of 1 April 2017 to 31 March 2020
25-Nov-16 Term Contract for the Maintenance of Transfer & Diverter Pumps, Booster Pumps, Submersible Pumps and Refuse Chute Flushing Systems for the period of 1 April 2017 to 31 March 2020
30-Sep-16 Replacement of Booster Pumpsets to 91 Blocks
30-Sep-16 Replacement of Refuse Handling Plant to 47 Blocks for Woodlands Division
30-Sep-16 Repairs & Redecoration to 23 Blocks at Blk 512 & 513 Wellington Circle, Blk 764, 764A, 765, 765A, 766 & 767 Woodlands Circle and Blk 801, 802, 804, 809, 810, 817, 819, 824, 825, 828, 829, 831, 833, 837 & 838 Woodlands St 81/82/83 in Sembawang and Woodlands Division
30-Sep-16 Replacement of Refuse Handling Plant to 50 Blocks for Sembawang Division