Cyclical Works
Cyclical Works

Our Town
The Town Council performs a series of repairs, repainting and replacements works on a cyclical basis in order to upkeep our estates in good condition. This ensures that residents living in older estates enjoy amenities, comfort and convenience that is on par with those found in newer blocks. Our schedule of cyclical works include:

See More

See More

See More

See More

See More



Blocks are given a fresh coat of paint and an updated colour scheme. Façade improvements may also be carried out.



The waterproofing membranes and secondary roof slab are checked and replaced.



Electrical wires and circuits are upgraded and replaced in order to ensure safety and reliability.



Booster and transfer pumps at our blocks are regularly checked, serviced and maintained. This facilitates suitable water pressure and uninterrupted water supply.



Various components are checked, maintained and replaced on a regular basis so as to minimise lift downtime and ensure reliable and safe service to residents.

UPCOMING
S/N | Project |
1 | Reroofing to 31 Blocks in Sembawang West Division (Blk 744 to 747, 748 to 763, 769 to 779) |
2 | Reroofing to 24 Blocks in Sembawang West Division (Blk 788 to 793, 787B to 788E and 786B to 798) |
3 | Repairs & Redecoration to 13 Blocks at Blk 116A, 117A–B, 118A–B, 131A–C, 132A–C, 117 & 132 Canberra Crescent in Sembawang Central |
ONGOING
S/N | Project |
1 |
Repairs and Redecoration to 25 Blocks at Woodlands Street 81/82/Circle and Retiling Works in Woodlands Division
|
2 |
Repairs and Redecoration to 18 Blocks at Block 501A to 507D in Sembawang Central Division
|
3 |
Repairs and Redecoration to 35 Blocks at Block 537 to 557 and 575 to 589 Admiralty Division
|
4 |
Repairs and Redecoration to 11 Blocks at Blk 108, 108A-C, 115, 115A-D Canberra Walk and 512, 513 Wellington Circle in Sembawang Central Division
|
5 |
Repairs and Redecoration to 18 Blocks at Blk 764, 764A, 765 TO 767, 783A-D, 784A-C, 785, 785A-E Woodlands Circle/ Crescent/ Rise in Sembawang West Division
|
6 |
Repairs and Redecoration to 26 Blocks at Blk 350A-C, 351A-D Canberra Road, 352A-C, 353A-C, 354A-D Admiralty Drive, 355 & 355A Sembawang Way, 588A-C, 589A-D Montreal Drive in Sembawang Central Division
|
7 | Repairs and Redecoration to 27 Blocks at Blk 401 to 425 Admiralty Link/ Sembawang Drive/ Canberra Road and Blk 717A/B Woodlands Drive 70 in Canberra & Sembawang West Divisions |
8 | Repairs and Redecoration to 29 Blocks at Blk 104A-D, 105, 106A-B, 107A-C, 121A-D, 128A-C, 129A-C Canberra Street and 119A-B, 120, 120A-D, 130A-B Canberra Crescent in Sembawang Central Division |
9 | Repairs and Redecoration to 22 Blocks at Blk 573, 573A-C, 574, 574A-B Woodlands Drive 16, Blk 691, 691A-D Woodlands Drive 73, Blk 693, 693A-D Woodlands Avenue 6, Blk 694 & 694A-D Woodlands Drive 62 in Admiralty Division |
10 | Repairs and Redecoration to 28 Blocks at Blk 685A-C, 686A-C, 687A-D Woodlands Drive 73 and 688A-F, 689A-F, 690A-F Woodlands Drive 75 in Admiralty Division |
11 | Repairs and Redecoration to 17 Blocks (At Blk 676A-B Woodlands Drive 71, 801, 802, 804, 809, 810, 817, 819, 824, 825, 828, 829, 831, 833, 837, 838 Woodlands Street 81/82/83) and Retiling Works to 42 Blocks in Woodlands Division |
12 | Repairs and Redecoration to 27 Blocks at Blk 361, 362A-C, 363A-C, 364A-B, 365, 365A-C and 366A-B Sembawang Crescent and Blk 482 to 493 Admiralty Link in Canberra Division |
13 | Reroofing to 43 Blocks at Blk 701 to 707 Woodlands Drive 40, Blk 708 to 717 Woodlands Drive 70, Blk 718 to 720 & 722 to 725 Woodlands Ave 6, Blk 721, 726 to 743 Woodlands Circle in Woodlands Division |
14 | Reroofing to 32 Blocks at Blk 839, 841, 844, 846, 851, 856 to 882 Woodlands Street 81/ 82/ 83/ Avenue 9 in Woodlands Division |
15 | Replacement/ Strengthening of Metal Sunbreakers’ Connection System to 101 Blocks in Admiralty, Sembawang West & Woodlands Divisions |
16 | Replacement/ Strengthening of Metal Sunbreakers’ Connection System to 86 Blocks in Canberra & Sembawang Central Divisions |
17 | Replacement of Metal Sunbreakers to 73 Blocks in Sembawang GRC |
COMPLETED
S/N | Project |
1 | Reroofing to 12 Blocks at Blk 601 to 605 Woodlands Drive 42, Blk 809, 810, 822, 823, 826, 827 & 836 Woodlands Street 81/82/83/84 in Woodlands Division |
2 | Electrical Rewiring to 66 Blocks at Admiralty and Woodlands Divisions at Block 606 to 623, 624A & B, 625A & B, 626, 626A, 627, 628A & B, 629 to 640, 630A, 643 to 664, 677 to 680 Woodlands Ave 4/6, Dr 52/ Ring Road |
3 | Balance of Works for Electrical Rewiring to 20 Blocks at Woodlands and Sembawang West Divisions at Block 601 to 605 Woodlands Drive 42 (WL) Block 744 to 747 Woodlands Circle, 788 to 793 Woodlands Ave 6, 794 to 798 Woodlands Dr 72 (SW) |
4 | Replacement of Water Pumpsets to 61 Blocks & Booster Pumpsets to 8 Blocks for Sembawang Town Council |
5 | Replacement of Water Pumpsets to 67 Blocks, Booster Pumpsets to 113 Blocks & Hose Reel Pressure Tanks to 6 Blocks for Sembawang Town Council |
6 | Replacement of Water Pipes to 26 Blocks at Sembawang West & Woodlands Divisions for Sembawang Town Council at Block 632-640, 665-673, 677-680 Woodlands Ring Road / Drive 71 / Avenue 6, Block 788B-E Woodlands Crescent |
7 | Replacement of Water Pipes at 56 Blocks in Canberra Division |
8 | Replacement of Water Pipes at 57 Blocks in Admiralty & Sembawang Central Divisions |
9 |
Repairs and Redecoration to 25 Blocks at Woodlands Street 81/82/Circle and Retiling Works in Woodlands Division
(Blks 803, 805-808, 816, 818, 820, 821, 830, 832, 834, 835, 840, 842, 843, 845, 847-850, 853-855 & 764B)
|
10 | Repairs and Redecoration to 18 Blocks at Blk 501A to 507D in Sembawang Central Division |
11 | Repairs and Redecoration to 35 Blocks at Blk 537 to 557 and 575 to 589 in Admiralty Division |
12 | Repairs and Redecoration to 23 Blocks at Blk 467, 467A, 467B, 468, 468A TO 468D, 469, 469A, 469B Admiralty Drive and Blk 470 to 481 Sembawang Drive in Canberra Division |