The Town Council performs a series of repairs, repainting and replacements works on a cyclical basis in order to upkeep our estates in good condition. This ensures that residents living in older estates enjoy amenities, comfort and convenience that is on par with those found in newer blocks. Our schedule of cyclical works include:

Repairs and redecoration

Blocks are given a fresh coat of paint and an updated colour scheme. Façade improvements may also be carried out.

Re-roofing

The waterproofing membranes and secondary roof slab are checked and replaced.

Electrical load upgrading /Electrical rewiring

Electrical wires and circuits are upgraded and replaced in order to ensure safety and reliability.

Pump maintenance and replacement

Booster and transfer pumps at our blocks are regularly checked, serviced and maintained. This facilitates suitable water pressure and uninterrupted water supply..

Lift works

Various components are checked, maintained and replaced on a regular basis so as to minimise lift downtime and ensure reliable and safe service to residents.

Repairs and redecoration
See More
Re-roofing
See More
Electrical load upgrading /Electrical rewiring
See More
Pump maintenance and replacement
See More
Lift works
See More
Repairs and redecoration

Blocks are given a fresh coat of paint and an updated colour scheme. Façade improvements may also be carried out.

Re-roofing

The waterproofing membranes and secondary roof slab are checked and replaced.

Electrical load upgrading /Electrical rewiring

Electrical wires and circuits are upgraded and replaced in order to ensure safety and reliability.

Pump maintenance and replacement

Booster and transfer pumps at our blocks are regularly checked, serviced and maintained. This facilitates suitable water pressure and uninterrupted water supply..

Lift works

Various components are checked, maintained and replaced on a regular basis so as to minimise lift downtime and ensure reliable and safe service to residents.

Our Town

UPCOMING

S/N Project
1 Repairs and Redecoration to 26 Blocks at Montreal Link and Woodlands Crescent
2 Repairs and Redecoration to 25 Blocks at Blk 319 to 338, 334A Sembawang Close / Crescent and Blk 463A, 463B & 463C Sembawang Drive
3 Electrical Rewiring to 23 Blocks at Blk 722 to 725 Woodlands Avenue 6 and Blk 721 & 726 to 743 Woodlands Circle
4 Electrical Rewiring to 20 Blocks at Blk 601 to 605 Woodlands Drive 42 and Blk 744 to 747 Woodlands Circle and Blk 788 to 793 Woodlands Avenue 6 and Blk 794 to 798 Woodlands Drive 72
5 Electrical Rewiring to 23 Blocks at Blk 701 to 707 Woodlands Drive 40, Blk 708 to 717 Woodlands Drive 70, Blk 718 to 720 Woodlands Avenue 6, Blk 853 to 855 Woodlands Street 83 and Bin Centers
6 Replacement of Water Pipes to 39 Blocks at Blk 809, 810, 822, 823, 826, 827, 836, 839, 841, 844, 846, 851, 856-882 Woodlands Street 81/82/83/ Avenue 4/9
7 Replacement of Water Pumpsets to 50 Blocks & Booster Pumpsets to 207 Blocks for Sembawang Town Council
8 Inspection and Modification of Rooftop Water Tank Overflow Pipes at HDB Blocks for Sembawang Town Council
9 Replacement of Refuse Handling Plant to 97 Blocks for Sembawang Town Council
10 Replacement and Comprehensive Maintenance of 56 Lifts under Cyclical Programme

 

COMPLETED

S/N Project
1 Repairs and Redecoration to 51 Blocks at Blk 753 to 758 Woodlands Avenue 4, Blk 759 to 763 & Blk 788 to 793 Woodlands Avenue 6, Blk 748 to 752 Woodlands Circle, Blk 787B to 788E & Blk 774 to 779 at Woodlands Crescent, Blk 769 to 773 & Blk 786B to 786F Woodlands Drive 16 and Blk 794 to 798 Woodlands Drive 72
2 Repairs and Redecoration to 46 Blocks at Blk 606 to 611, Blk 632 to 640, Blk 643 to 658 Woodlands Ring Road, Blk 612 to 618 Woodlands Avenue 4, Blk 677 to 680 Woodlands Avenue 6 and Blk 744 to 747 Woodlands Circle
3 Electrical Wiring to 37 Blocks at Blk 822, 823, 826, 827, 836, 839, 841, 844, 846, 851 & 856 to 882 Woodlands Street 81/82/83/Avenue 4/9
4 Replacement & Comprehensive Maintenance of Twelve (12) Existing Lifts under Selective Lift Replacement Programme
5 Replacement and Comprehensive Maintenance of 200 Lifts under Cyclical Programme
6 Replacement and Comprehensive Maintenance of 80 Lifts under Cyclical Programme